Size of Project

42 Tonnes

Location

Surrey

Client

County Estate Hotel

Beaverbrook Health Club

Situated in the heart of the exclusive Beaverbrook Estate, Builders Beams provided the client with a two-storey structural steel solution to house a new spa, pool and health facilities at the Country Estate Hotel. Due to the location, the team had a number of considerations to factor in to the programme of works, such as noise and access restrictions, plus a defined 12 week schedule to work to. A number of visits were made to the site prior to commencing works, to assess the suitability of access for our vehicles and the 35 tonne crane required during the erection of the steel frame. The decking and frame were erected concurrently.

Scope of Works

  • Approximately 42 tonnes
  • 192 pieces
  • Fabricated to EXC2
  • 805sqm metal decking
  • 18 tonne curving/cambering
  • Survey of existing concrete structure
  • In house design & detailing
  • Full programme of works
  • Restricted access & noise restrictions
  • 12 week programme

Download Case Study PDF

Other Case Studies:

Garden Link Bridge, Corniche - Steel Construction with Builder Beams

Garden Link Bridge

Cornerstone Hub Car Park - Steel Construction with Builders Beams
Builders Beams Steel Fabricator - Project Portfolio: Christian Dior Bond Street

Bond Street